TR EN ES
Industrial Primers

Industrial Primers

It is an air-drying industrial primer that creates a solid base for the top coat paint to be applied. It has high filling power, dries quickly and adheres well to the applied surface. It is a primer that protects the surface of the material on which is applied against corrosion, since it has high water resistance.

Product Features

  • Product Name
  • Product Description
  • Chemical Structure
  • TDS
  • SDS
  • Density, 20°C gr/cm3
  • Viscosity, 25°C, DIN4 sec.
  • Solid (by weight) ,%
  • Set-to-Touch Time, min.
  • Tack-free Time, min.
  • Dry-hard time, hour
  • Dry-Through time, day
  • Product Highlights
  • Areas of usage
  • Mixing Ratio
  • Recommended Use
  • Storage Conditions
  • Package Type
  • explanation
  • EN.6531
  • Industrial Primer Gray
  • Alkyd
  • 1,60± 0,03
  • 110± 5
  • 76± 3
  • 10± 5
  • 40± 5
  • 3± 1
  • 2± 1
  • *Fast drying *Higher hiding power *Corrosion-resistant
  • In the automotive sub-industry, as a rust inhibitor on surfaces such as construction machinery it is used as a primer on all surfaces where industrial topcoat paints are applied.
  • EN.6531 : 100
    Rapid/SLT-2000(spray) : 35-40
    Rapid/SLT-2000 (brush) : 15-20
  • The surface to be painted should be free of dirt, rust and dust. It should be primed with Eskim Primer.Swelled, loose and old paint should be scraped and the entire surface should be sanded,puttying should be done for potholes and cracks. The application surface must be clean and dry.
    Before use, it should be mixed thoroughly and homogenized. After mixing with suitable thinner, it is applied directly or with a pistol on the primed surface.It is recommended to apply the second coat 1 hour after the first coat or after the hard drying is complete. Otherwise, the paint film may wrinkle. The product should be applied to 6-8 kg/m2. During the application, the ambient temperature should not be below 5 °C.
  • It should be stored in closed packages, in a dry clean, cool environment that will not be exposed to direct sunlight. In its original packaging, the stock period is 1 year.
  • 15 kg / 3 kg
  • *The values are valid at 23°C ambient temperature and 50% ± 10% relative humidity conditions.
  • EN.6532
  • Industrial Primer Red
  • Alkyd
  • 1,60± 0,03
  • 110± 5
  • 76± 3
  • 10± 5
  • 40± 5
  • 3± 1
  • 2± 1
  • *Fast drying *Higher hiding power *Corrosion-resistant
  • In the automotive sub-industry, as a rust inhibitor on surfaces such as construction machinery it is used as a primer on all surfaces where industrial topcoat paints are applied.
  • EN.6532 : 100
    Rapid/SLT-2000(spray) : 35-40
    Rapid/SLT-2000 (brush) : 15-20
  • The surface to be painted should be free of dirt, rust and dust. It should be primed with Eskim Primer.Swelled, loose and old paint should be scraped and the entire surface should be sanded,puttying should be done for potholes and cracks. The application surface must be clean and dry.
    Before use, it should be mixed thoroughly and homogenized. After mixing with suitable thinner, it is applied directly or with a pistol on the primed surface.It is recommended to apply the second coat 1 hour after the first coat or after the hard drying is complete. Otherwise, the paint film may wrinkle. The product should be applied to 6-8 kg/m2. During the application, the ambient temperature should not be below 5 °C.
  • It should be stored in closed packages, in a dry clean, cool environment that will not be exposed to direct sunlight. In its original packaging, the stock period is 1 year.
  • 15 kg / 3 kg
  • *The values are valid at 23°C ambient temperature and 50% ± 10% relative humidity conditions.
  • EN.6540
  • Industrial Primer Eco Gray
  • Alkyd
  • 1,65± 0,03
  • 110± 5
  • 78± 3
  • 10± 5
  • 40± 5
  • 3± 1
  • 2± 1
  • *Fast drying *Higher hiding power *Corrosion-resistant
  • In the automotive sub-industry, as a rust inhibitor on surfaces such as construction machinery it is used as a primer on all surfaces where industrial topcoat paints are applied.
  • EN.6540 : 100
    Rapid/SLT-2000(spray) : 35-40
    Rapid/SLT-2000 (brush) : 15-20
  • The surface to be painted should be free of dirt, rust and dust. It should be primed with Eskim Primer.Swelled, loose and old paint should be scraped and the entire surface should be sanded,puttying should be done for potholes and cracks. The application surface must be clean and dry.
    Before use, it should be mixed thoroughly and homogenized. After mixing with suitable thinner, it is applied directly or with a pistol on the primed surface.It is recommended to apply the second coat 1 hour after the first coat or after the hard drying is complete. Otherwise, the paint film may wrinkle. The product should be applied to 6-8 kg/m2. During the application, the ambient temperature should not be below 5 °C.
  • It should be stored in closed packages, in a dry clean, cool environment that will not be exposed to direct sunlight. In its original packaging, the stock period is 1 year.
  • 15 kg / 3 kg
  • *The values are valid at 23°C ambient temperature and 50% ± 10% relative humidity conditions.